38.3.1 Development Process - WinGP

The following figure shows the process flow, from installing WinGP, starting GP-Pro EX, creating screens, and connecting to the device/PLC, to running project files on the IPC or PC/AT compatible machine. Click the link to view the page explaining each process.

1. Install WinGP

38.3.2 Installing/Uninstalling WinGP

2. Start GP-Pro EX to create a new project file.

38.3.3 Starting GP-Pro EX to Creating Projects - WinGP

3. Select IPC or PC/AT compatible [Display Type] and [Device/PLC Type].

38.3.3.1 Selecting the Display Unit and Device/PLC - WinGP

4. Create and save a screen in GP-Pro EX.

38.3.3.2 Create/Save - WinGP

5. Start WinGP on the IPC or PC/AT compatible machine and transfer the project file to the IPC or PC/AT compatible unit.

38.3.4 Transfer - WinGP

6. Start and run WinGP.

38.3.5 Starting/Running WinGP
For the PLC connection cable, see the device connection manual for each manufacturer.

7. Exit WinGP

38.3.6 Exit WinGP