![]() |
||||||||||||||
|
|
||||||||||||||
|
||||||||||||||
Minimize Operations and Labor Required after Layout. Confirm screen performance before transfer.Verify Performance and Operation without Hardware.
A simulation environment can be created on your PC. Prevent errors in operations by allowing confirmation and debugging before transfer.
Confirm screen performance before transfer without connecting to PLC. Check actions performed using the touch panel installed by clicking with the mouse.
Confirm current values for addresses allocated to I/O driver terminal.
In simulation mode the value or state of Logic Variables, and simulated I/O points can be changed for easy debugging.
Confirm present values and ON/OFF status of symbol variables before transferring the project file. Minimize labor involved in logic program debug.
Supports Mitsubishi Electric PLC simulation software*. Debugging on a PC significantly reduces development time. *Requires Mitsubishi Electric development tools GX Developer, GX Simulator, and MX Component.
Output the list of used addresses as a CSV file to perform a cross reference check. You can select to output either individual screens or all screens.
Select and print required setup information of the project file. Minimize documentation labor.
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Copyright (C) 1996- Digital Electronics Corporation All rights reserved. |